Steve Jackson Games - Site Navigation
Home General Info Follow Us Search Illuminator Store Forums What's New Other Games Ogre GURPS Munchkin Our Games: Home

Go Back   Steve Jackson Games Forums > The Network > GURPS Vehicle Builder

Reply
 
Thread Tools Display Modes
Old 12-14-2006, 12:40 PM   #11
AOTA
 
AOTA's Avatar
 
Join Date: Aug 2004
Location: Olathe, KS
Default Re: More GVB questions

Quote:
Originally Posted by Ieldra
Any idea when we'll see it?
From what I read on another thread best guess might be some time during second quarter 2007.
__________________
Bob Gilson
Mib#3477
Formally Bobzilla
GURPS Checker for Prime Directive
AOTA is offline   Reply With Quote
Old 12-14-2006, 12:49 PM   #12
tjoneslo
 
Join Date: Aug 2004
Location: Vermont
Default Re: More GVB questions

The Playtest draft turned power-cells (and batteries) into power plant (with a kW output) and a storage capacity (in kWs). This let the designers more clearly distinguish between a capaiceter (with a high discharge rate) and a chemical cell (with a slower one, but larger capacity).

GVD is somewhere in the several month long editing process. Current estimate is the first half of next year, probably.
__________________
Thomas Jones-Low: tjoneslow@gmail.com
Vehicle Builder Guru and gearhead
Librarian at Traveller Wiki
tjoneslo is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Fnords are Off
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 04:52 PM.


Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.